PROJECTS
P2303 can trinxet
P2203 el molinot
P2202 la nogareda
P2403 benet mateu
P2404 el masnou
P2204 de la rosa
P1901 three columns

COMPETITIONS
C2404 ponteareas
C2402 quart
C2204 figueres

RESEARCH
R2402 demolitions and deconstructions
R2401 emergency infraestructures
R2301 a collection of bioclimatic responses
R2201 infrastructures of resistance
R2002 never ideological
R2001 temples of the periphery



©2022-2025

ponteareas

competition for the reconversion of a market building into a public library

The intervention prioritises the reuse of the existing structure, with minimal demolition limited to specific areas at the entrance and rear. These targeted operations enable the creation of double-height spaces, enhancing natural light and visual continuity, while significantly reducing construction waste.



The library is articulated in two volumes around a central courtyard, connected through a compact circulation core. The new volumetry introduces a more prominent façade facing the square and lowers the rear to optimise solar exposure on adjacent streets. A thermodynamic façade captures energy, and two large skylights bring natural light into the entrance and multipurpose hall.



Client:
Location:
Size:
Year:
Status:

public
Ponteareas, Galicia
3.786 sqm
2024
n/a